Representative Projects::
Some recent and current projects have been picked to give a clear idea of services provided by Geolink Consulting.
| 1. | Exploration and evaluation (re-evaluation) of groundwater resources and their exploitation conditions |
| 2. | Development of groundwater management information systems and continuous models |
| 3. | Development of groundwater and environmental monitoring systems |
| 4. | Prediction and substantiation of measures on elimination of soils, unsaturated zone and groundwater contamination with oil products |
| 5. | Geoenvironmental predictions in influence zones of mining enterprises |
| 6. | Geoenvironmental predictions for engineering measures substantiation by construction |
| 7. | Substantiation of environmental protection measures by development projects affecting water infrastructure. |
| 8. | Environmental assessment of decorative and bathing pools reconstruction, neighboring territory accomplishment and substantiation of water-protection zones for the rivers of Moscow |
| 9. | Project substantiation by irrigating systems construction |
| 10. | Research projects related to hydrogeological technique development, regional generalization and numerical simulation. |
Exploration and evaluation (re-evaluation) of groundwater resources and their exploitation conditions
Project scope: Mathematical simulation of groundwater flow for evaluation of groundwater resources and usable reserves in the large synclinal structures of the Czech Cretaceous Artesian Basin (the Czech Republic).
Client: Water canal facilities, Vodni Zdroje Chrudim company
Timeframe: 1991-1996
Project scope: Mathematical simulation of groundwater flow for evaluation of groundwater resources and usable reserves for water supply of populated areas in the Czech Republic.
Client: Czech municipal authorities, Water canal facilities, Vodni Zdroje Chrudim company
Timeframe: 1992-ongoing
Project scope: Evaluation of fresh groundwater usable resources for the cities and settlements of the Ryazan region using numerical modeling techniques.
Client: Rosgiprovodkhoz
Timeframe: 1994
Project scope: Mathematical simulation of groundwater flow and mass transport for evaluation of groundwater resources and usable reserves for water supply of Hradec Kralove and Pardubice cities.
Client: Water canal facility of Karlov Dvor town, Vodni Zdroje Chrudim company
Timeframe: 1995
Project scope: Re-evaluation of usable reserves of technical drainage groundwater, taking into account the development of Mikhailovsky Ore Mining and Dressing Plant (MOMDP) drainage system.
Client: Mikhailovsky Ore Mining and Dressing Plant
Timeframe: 1996-2002
Project scope: General project on re-evaluation of usable reserves and groundwater monitoring system development for water intake facilities in the central part of the Moscow Artesian Basin (the Moscow region) and particular water intake sites.
Client: Ministry of Natural Resources of the Russian Federation, Central Regional Geological Center
Timeframe: 1997
Project scope: Re-evaluation of fresh groundwater usable reserves in the central part of the Moscow Artesian Basin (the Moscow region).
Client: Ministry of Natural Resources of the Russian Federation, Central Regional Geological Center
Timeframe: 1998-ongoing
Project scope: Re-evaluation of groundwater usable reserves of the operating water intakes for drinking water supply of populated localities in the Moscow region.
Client: Water-canal facilities and housing services
Timeframe: 1997-ongoing
Project scope: Mathematical simulation of water intake operation and evaluation of groundwater usable reserves, taking into account the salt water seepage, for Osinki township, the Samara region.
Client: Sredvolgagiprovodkhoz
Timeframe: 1999
Project scope: Mathematical simulation of water intake operation, taking into account a possible hydrocarbon contamination and evaluation of groundwater usable reserves for water supply of Novokuibyshevsk city, the Samara region.
Client: Sredvolgagiprovodkhoz
Timeframe: 2000
Project scope: Consulting services on: evaluation of ground and surface water resources; design of water reservoirs and ground and surface water monitoring system in the coastal basin of Syria.
Client: Rosintervod
Timeframe: 2000
Project scope: Mathematical simulation and evaluation of groundwater usable resources for water supply of Kandalaksha city (the Murmansk region).
Client: Apatitgeologia
Timeframe: 2001
Project scope: Evaluation of groundwater resources for water supply of Chernigovka city, the Samara region, by mathematical simulation techniques.
Client: Sredvolgagiprovodkhoz
Timeframe: 2001
Project scope: Re-evaluation of groundwater usable reserves for the operating water intakes in Michurinsk city, the Tambov region.
Client: Ministry of Natural Resources of the Russian Federation, Tambov branch office.
Timeframe: 2001-ongoing
Project scope: Mathematical simulation of groundwater flow for re-evaluation of usable reserves at the Oksky groundwater field for water supply of Tula city.
Client: Ministry of Natural Resources of the Russian Federation, Tula branch office, Tula-Nedra.
Timeframe: 2001-ongoing
Development of groundwater management information systems and continuous models
Project scope: Development of the hydrogeological information system for natural resources management on the KMA territory (the Belgorod Region).
Client: Ministry of Natural Resources of the Russian Federation, Belgorod branch office, Lebedinsky Ore Mining and Dressing Plant.
Timeframe: 1996-ongoing
Project scope: Continuous groundwater flow model development for the northern part of the Kursk Magnetic Anomaly, the Kursk region.
Client: Ministry of Natural Resources of the Russian Federation, Kursk branch office, Mikhailovsky Ore Mining and Dressing Plant
Timeframe: 1996-ongoing
Project scope: Information system development for the groundwater withdrawal management on the territory of Bryansk city.
Client: Ministry of Natural Resources of the Russian Federation, Bryansk branch office, Bryanskvodocanal
Timeframe: 1998-ongoing
Project scope: Continuous groundwater flow model development for the Ob-Tom' interfluve area.
Client: Tomskgeomonitoring
Timeframe: 1998
Project scope: Groundwater management information system development for the Kursk Magnetic Anomaly territory (Bryansk, Oryol, Kursk and Belgorod regions) for geological and environmental conditions estimation and forecast.
Client: Ministry of Natural Resources of the Russian Federation, Centrregionmonitoring
Timeframe: 2001-ongoing
Project scope: Development of different-scaled continuous groundwater flow models for the territory of the Moscow Brown Coal Basin (Mosbass, the Tula and Novomoskovsk industrial districts).
Client: Ministry of Natural Resources of the Russian Federation, Centrregionmonitoring
Timeframe: 2001-ongoing
Project scope: Groundwater management information system development for the Tungus field (the Jewish Autonomous Area of the Russian Federation) for drinking water supply of Khabarovsk city.
Client: Dalgeomonitoring
Timeframe: 2001
Development of groundwater and environmental monitoring systems
Project scope: Full-cycle software development for the State Groundwater Monitoring Information System of the Russian Federation.
Client: Geological Survey of Russia
Timeframe: 1994-1996
Project scope: Elaboration of complex groundwater monitoring program for the Moscow Region for 1997-2002.
Client: Ministry of Natural Resources of the Russian Federation, Central Regional Geological Center
Timeframe: 1997
Project scope: Conception formulation for comprehensive ground and surface water monitoring system for the Upper Volga Basin.
Client: Centrvodkhoz
Timeframe: 1998
Project scope: Development of ground and surface water monitoring system for the Upper Volga Basin in the context of the Ivan'kovskoye water storage regime management (Russia, Tver and Moscow regions) and comprehensive ground and surface water monitoring of the Upper Volga Basin.
Client: Centrvodkhoz
Timeframe: 1998-ongoing
Project scope: Software development for the State Geological Monitoring Information System of the Russian Federation
Client: Ministry of Natural Resources of the Russian Federation
Timeframe: 1998-2000
Project scope: Software development for the State Geological Monitoring Information System of the Russian Federation.
Client: Ministry of Natural Resources of the Russian Federation
Timeframe: 2001-ongoing
Project scope: Groundwater and environmental monitoring system development and methodology elaboration for test grounds.
Client: Central Regional Department of Natural Resources
Timeframe: 2000
Project scope: Migration model development and prediction of groundwater contamination by radionuclides using the results of observations over the consequences from the Chernobyl accident at the test ground quot;Demenka" in the Bryansk region.
Client: Bryanskgeologia
Timeframe: 2001-ongoing
Project scope: Project elaboration and establishment of local groundwater monitoring system aimed at optimizing the exploitation of the acting drinking water-intakes in Norilsk city
Client: Ministry of Natural Resources of the Russian Federation, Taimyr branch office
Timeframe: 2001-ongoing
Project scope: Development of natural resources monitoring information system for the Mutnovsky steam hydrotherm field (Russia, Kamchatka peninsula).
Client: Vostokgeologiya
Timeframe: 2002-ongoing
Prediction and substantiation of measures on elimination of soils, unsaturated zone and groundwater contamination with oil products
Project scope: Prediction of groundwater quality changes in the area of the Slovakian State Ground Oil reservoirs and substantiation of engineering measures on drinking water intakes protection and groundwater oil decontamination.
Client: Hydropol, Vodni Zdroje Chrudim
Timeframe: 1992
Project scope: Mathematical modeling and elaboration of recommendations on groundwater oil decontamination at the Novokuibyshevsky oil refining plant in the Samara Region.
Client: Sredvolgagiprovodkhoz
Timeframe: 1997
Project scope: Mathematical modeling of groundwater and unsaturated zone oil decontamination in the area of Kmetinevec (the Czech Republic).
Client: Vodni Zdroje Chrudim
Timeframe: 1998
Project scope: Simulation of the dissolved oil products migration after an accident and assessment of possible contamination of surface waters and sources of water supply in the area of Kmetinevec (the Czech Republic).
Client: Vodni Zdroje Chrudim
Timeframe: 2000
Project scope: Operational efficiency assessment for the wells pumping out oil products and mathematical simulation of groundwater oil decontamination on the territory of "Bryansk" oil refinery.
Client: Bryanskgeologia
Timeframe: 2001
Project scope: Efficiency assessment for groundwater clean-up of oil products using a complex drainage system in the area of LPDS-8N (Bryansk city).
Client: Bryanskgeologia
Timeframe: 2001
Project scope: Hydrocarbons migration simulation to optimize oil lens liquidation technology along with monitoring system on the territory of the Novokuibyshevsky oil refinery.
Client: Sredvolgagiprovodkhoz
Timeframe: 2001-ongoing
Geoenvironmental predictions in influence zones of mining enterprises
Project scope: Model prediction of environmental consequences after the South-Moravian lignite mines closure and substantiation of ground and surface water monitoring project (the Czech Republic).
Client: South-Moravian Lignite Mines, Vodni Zdroje Chrudim
Timeframe: 1996
Project scope: Model prediction of an impact of the worked-out sand quarries in Lipa Village (the Czech Republic, the area of Tynechte-upon-Orlitce) upon shallow groundwater, drinking water intakes and the conditions of vegetation growth.
Client: Prefa, Vodni Zdroje Chrudim
Timeframe: 2000
Project scope: Preliminary simulation of an impact of the sand quarry Strelec drainage system exploitation upon the environmental situation on the neighboring territories, and the substantiation of the project on ground and surface water monitoring (the Czech Republic, the area of Ichin).
Client: Sklopisek Strelec - EXIMOS, Vodni Zdroje Chrudim
Timeframe: 1997
Project scope: Model prediction of an impact of the sand quarry Strelec drainage-system exploitation upon the environmental situation on the neighboring territories was made based on the ground and surface water monitoring data (the Czech Republic, the area of Ichin).
Client: Sklopisek Strelec - EXIMOS, Vodni Zdroje Chrudim
Timeframe: 2001
Project scope: Model prediction of mining impact upon the drinking water intakes and scale of technogenic solute distribution produced in the course of the deposit development by underground leaching and after its completion (Central Asia).
Client: U.S.-based environmental consulting company
Timeframe: 2002
Geoenvironmental predictions for engineering measures substantiation by construction
Project scope: Substantiation of protective measures against inundation for the Historical Center in Rybinsk town.
Client: Municipality of Rybinsk city
Timeframe: 1994
Project scope: Model substantiation for protective drainage construction for several urban development projects.
Client: Mosengproject
Timeframe: 1996-1997
Project scope: Model substantiation for construction of several pedestrian underpasses in Moscow downtown.
Client: Mosengproject
Timeframe: 1998-1999
Project scope: Model substantiation for construction of transport tunnels in Moscow.
Client: Mosengproject
Timeframe: 1997-1998
Project scope: Model substantiation for construction of water pipelines in Moscow.
Client: Mosengproject
Timeframe: 1997-2001
Project scope: Substantiation of engineering protection and drainage of slopes in connection with design of shore consolidation and embankments development in Moscow.
Client: Mosengproject
Timeframe: 1997
Project scope: Substantiation of drainage system for protection of the "Sretenka" housing block in Moscow from inundation.
Client: Mosengproject
Timeframe: 1997
Project scope: Model substantiation of dike reconstruction on the Borisovsky pond in Moscow.
Client: Mosengproject
Timeframe: 2000
Project scope: Model substantiation of engineering measures on rainfall and thawed waters removal and assessment of their environmental impact.
Client: Mosengproject
Timeframe: 1995-1996
Substantiation of environmental protection measures by development projects affecting water infrastructure.
Project scope: Impact assessment from the Ramenka river channelization (Moscow) by canal and waterworks construction upon the hydrological regime and hydrogeological conditions of neighboring territories and prediction of channel and slope processes.
Client: Mosengproject
Timeframe: 1996
Project scope: Impact assessment from the Ramenka river channelization (Moscow) upon the hydrological regime and hydrogeological conditions of neighboring territories and prediction of channel processes.
Client: Mosengproject
Timeframe: 1999
Project scope: Elaboration of environmental protection measures for shopping center construction project in the "Mitino" district (Moscow).
Client: Mosvodocanalproject
Timeframe: 1999
Project scope: Elaboration of environmental protection measures for Lyublino irrigation fields recultivation project in connection with residential development in Moscow.
Client: Mosengproject
Timeframe: 2000
Project scope: Elaboration of environmental protection measures for transport highway construction project in the "South Butovo" district (Moscow).
Client: Mosengproject
Timeframe: 2000
Project scope: Elaboration of environmental protection measures for pond reconstruction and landscape park accomplishment in the "Mitino" district (Moscow).
Client: Mosproject
Timeframe: 2000
Environmental assessment of decorative and bathing pools reconstruction, neighboring territory accomplishment and substantiation of water-protection zones for the rivers of Moscow
Project scope: Project substantiation for the park "Terletskaya Dubrava" (Moscow) accomplishment and waterworks construction for regulation of water regime in ponds.
Client: Mosvodostok
Timeframe: 2000
Project scope: Impact assessment of residential development in the "Novokosino" district (Moscow) upon the water regime in the Kosino lakes and the preparation of recommendations on rainfall and thawed waters removal.
Client: Mosproject
Timeframe: 1995
Project scope: Elaboration of recommendations for Egersky pond (Moscow) reconstruction.
Client: Mosengproject
Timeframe: 1998
Project scope: Elaboration of environmental protection measures for of the territory accomplishment in the proximity of large pond in the "South Butovo" district (Moscow).
Client: Mosengproject
Timeframe: 1995
Project scope: Elaboration of recommendations for ponds reconstruction on the Ochakovka River (Moscow) within the zone of residential building.
Client: Mosproject
Timeframe: 2001
Project scope: Preparation of recommendations and substantiation of drainage actions by the Gorodnya River (Moscow) flood-plain accomplishment.
Client: Mosengproject
Timeframe: 1998
Project scope: Methodology development and substantiation of water-protective zones for the rivers in Moscow.
Client: Moscow Urban Planning Institute
Timeframe: 1999-2000
Project substantiation by irrigating systems construction
Project scope: Substantiation of irrigation and drainage regime in the Omsk irrigating system covering an area of 400.000 ha (South Siberia).
Client: Omskhyprovodkhoz
Timeframe: 1993
Project scope: Salt regime prediction in the lagoon Sasyk and assessment of possible water use for irrigation in the south of Ukraine.
Client: Ukryuzhhyprovodkhoz
Timeframe: 1995
Research projects related to hydrogeological technique development, regional generalization and numerical simulation.
Project scope: Technique development for regional assessment of aquifers' vulnerability to contamination.
Client: Central Regional Department of Natural Resources
Timeframe: 2000
Project scope: Technique development for regional mapping of groundwater recharge conditions and intensity of aquifers recharge.
Client: Central Regional Department of Natural Resources
Timeframe: 2000
Project scope: Technique development for mathematical simulation of substances migration by groundwater quality study.
Client: Ministry of Natural Resources of the Russian Federation
Timeframe: 2001-ongoing
Project scope: Model development for the underground and surface run-offs in river basins as the basis for evaluation of natural groundwater resources.
Client: Ministry of Natural Resources of the Russian Federation
Timeframe: 2001-ongoing
Project scope: Technique development for medium-scaled mapping of groundwater vulnerability to contamination.
Client: Ministry of Natural Resources of the Russian Federation
Timeframe: 2001-ongoing
Project scope: Methodology elaboration and hardware design for water balance investigations and groundwater monitoring.
Client: Ministry of Natural Resources of the Russian Federation
Timeframe: 2001-ongoing

